Modernisation of control system for the station deoxygenated water
Previously used system based on SattCon 05 Slimline controller has been replaced by new system based on Siemens controller. The new system uses the controller Siemens S7-400 already working in the filtration station. Old system prevented any modification due to lack of knowledge of how and technical assistance for the working unit. Diagnosis and replacement of defective parts during the crash was long and unprofitable. Today the station of deoxygenated water operates only ET200M module which is a distributed network of Profibus DP unit. The control panel working until now with the system has been replaced by the panel MP 277 from Siemens. The functionality of the entire system is fully preserved. Handling of the system using the panel is corrected according to the customer suggestions. In addition, previously discussed the integration of control with filtration station, allowed the expansion of the system with the possibility of remote control. It uses the existing control system and visualisation software based on BREWMAXX from ProLeiT. The project included:
- the software for PLC Siemens S7-400
- the software for operator panel - WinCC Flexible
- modifications of visualisation software BREWMAXX
- necessary electrical modifications
- performance of electrical documentation in EPLAN
Feel free to contact us:
PROJECT
Industrial Automation
ul. Górnicza 23/3
43-225 Wola
Tel: +48 32 307 07 67
Mobile: +48 604 296 022
E-mail: biuro@project-ap.com